Home additions · Edgewater, NJ 07020

Home additions in Edgewater, NJ

Edgewater’s houses sit on small lots on the hillside below the Palisades. So an addition here turns on two questions most towns never ask: whether your ground counts as a steep slope, and how many stories the hill says your house already has.

The first question

Is your lot a steep slope?

The Borough’s code treats any slope of 20 percent or more, measured over a run of at least 10 feet, as a steep slope. That is a two-foot rise over ten feet of ground, which is not unusual on the hillside. On a steep slope, any disturbance is prohibited unless an exception applies.

“Disturbance” is broad. It covers placing an impervious surface, moving soil or rock, and clearing vegetation, and the code counts decks, patios, gravel and even porous paving as impervious. So a rear deck on the hill is caught by the same rule as a room.

The exception that matters most to a homeowner is redevelopment within existing impervious surfaces. In plain terms:

  • Building over what is already there is the exception the code spells out, such as where the house or paving already stands. A second story on the existing footprint should fit it, but confirm that with the zoning officer.
  • Digging into untouched hillside is the hard case. New disturbance is limited to narrow grounds, such as extraordinary hardship peculiar to the property.

That is why going up is often a better fit here than going out. Plans have to show the proposed work against the topography, with contours at two feet or less. In a 2022 hillside case, the Board’s engineer asked for a percentage calculation of the slope disturbance and said any retaining wall over four feet of exposed height must be designed by a New Jersey licensed engineer. Our second-story guide covers what going up asks of the house.

The second question

How many stories does the hill say you have?

The R-2 zone allows 2½ stories. On a slope, your house may already be counted as more than it looks from the street.

When a basement counts

It counts as a story above grade if the finished floor above it is more than six feet above grade plane, or more than six feet above the finished ground for over half the perimeter.

The 12-foot test

It also counts if that floor is more than 12 feet above the finished ground at any single point. On a hillside, that point is usually the downhill corner.

What a half story is

Space under a sloping roof, where the roof meets the wall no more than three feet above the floor and much of the floor has low headroom. A flat roof does not give you one.

When height gets harder

Going 10 feet or 10 percent over the limit takes a “d” variance rather than a “c” variance, and a different legal test. In a 2022 addition case, 36 feet against a 32-foot limit did that.

In that same case, the Borough’s planner asked the applicant to confirm whether the basement counted as a story, because the survey showed a three-story house. Settle this before anyone draws.

The limits

The R-2 zone, as filed with the Board.

R-2 is the Borough’s single- and two-family zone. These figures come from a zoning chart filed in a 2022 single-family addition, and the Borough planner’s review of that case confirms the lot area and height. R-1 and R-40 have their own figures.

RuleR-2
Minimum lot5,000 sq ft, 50 ft wide, 100 ft deep
Front yard20 ft, more on a narrow street
Each side yard8 ft
Rear yard20 ft
Building coverage45%, counting porches and decks
Impervious coverage60%
Height2½ stories, 32 ft average, 38 ft to the peak

Narrow streets. On a street less than 50 feet wide, the front yard grows by half the difference. So a 40-foot street adds five feet, and a 20-foot front yard becomes 25.

Corner lots. A corner lot has two front yards, and you can choose one of them to reduce by five feet.

Small lots. The lot in that 2022 case was 4,000 square feet and 40 feet wide, and its short front and side yards were treated as existing conditions. An existing shortfall can stay, but the code says it cannot be reduced further, so plan the addition around it.

Decks and patios. A deck has to meet the same yards as the house. A patio may sit in a rear or side yard, though on a steep slope it is still a disturbance.

The paperwork

What else the Borough looks at.

Trees

A permit is needed for any non-street tree of six inches caliper or more. File by the 10th of the month to be heard that month.

Filing

Applications go to the Building Department: 18 hard copies plus a digital set, at least 10 days before your meeting.

Notices

Certified mail to owners within 200 feet, 10 days ahead. One 2022 hillside filing also listed owners in Cliffside Park.

Drainage

In a 2022 case, the Board’s engineer asked for calculations and for seepage pits at least two feet above the seasonal high water table.

The Board’s report for 2023 lists two applications seeking only bulk variances, and one of them was an addition to a single-family house. Our guide to New Jersey addition rules explains how a variance is decided.

The houses

Hillside houses, and a custom home of ours.

The towers along River Road get the attention, but Edgewater’s houses are on the steep streets below the cliff: narrow-lot frame houses and small colonials and capes from the early to mid 1900s, built for the people who worked in the waterfront factories. The lots are narrow, so there is little room to add out, which is why the questions above come first.

We know this ground because our office is here, and because we have built on it. Our custom home in Edgewater is a new house, not an addition, but it sits on a hard lot with the street above the first floor, and the drainage and the carport took real planning. Closer to the river, ask about flood mapping and the ground before anyone excavates, because the waterfront has tidal flood exposure and an industrial past.

See home additions for the options. If the slope or the structure rules out adding on, new home construction may be the better conversation, and our guide to tearing down and building new covers what comes first.

Keep reading

The rest of the job in Edgewater.

Questions
Do you build additions in Edgewater?

Yes, anywhere in 07020, and our office is in the borough. We start with the survey and the slope, work with your architect or help you find one, and file the permits. Roofing and siding are our own trades, and we schedule the licensed plumbers, electricians and heating contractors.

Can I build an addition on a steep lot in Edgewater?

It depends on where the addition goes. The Borough treats a slope of 20 percent or more as a steep slope, and disturbing one is prohibited outside a few exceptions. One exception is redevelopment within existing impervious surfaces, so building over what is already paved or built is a very different case from digging into the hillside.

Does a basement count as a story in Edgewater?

It can. The code counts a basement as a story above grade if the finished floor above it is more than six feet above grade plane, more than six feet above the finished ground for over half the building's perimeter, or more than 12 feet above the finished ground at any point. On a hillside, the downhill side can trigger that.

How tall can a house be in Edgewater's R-2 zone?

A zoning chart filed with the Board in 2022, and the planner's review of that case, give 2½ stories, 32 feet on average and 38 feet to the peak. Confirm the figures for your lot with the Building Department, because R-1 and R-40 are separate zones.

Who hears a variance in Edgewater?

The Zoning Board of Adjustment. Applications go to the Building Department, with 18 hard copies plus a digital set at least 10 days before your meeting. Notices go by certified mail to owners within 200 feet and into The Record, 10 days before the meeting.

Do I need a permit to take down a tree in Edgewater?

Often, yes. The Borough's form requires a permit for any non-street tree of six inches caliper or more, and for any tree on public property over 2.5 inches. Trees on Borough property or within 10 feet of the right-of-way go to the Shade Tree Commission.

Where these rules come from

Chapter 240 of the Borough code, read in a published copy of Article XI (yards and steep slopes) and Article X; the Borough’s procedures for Board approvals; its tree removal permit form; the Board of Adjustment case files, which hold the 2022 filings and reviews we cite; and the Board’s report for 2023.

We read these in November 2026. We could not open the Borough’s own schedule of zone limits, so the R-2 figures come from one case filing, not from the schedule itself. Towns change their rules, and your zone, your lot and the way the house sits today all change what applies. Confirm any figure with the Building Department before you rely on it. This is general information, not legal advice.

Start with the survey

Find out what your hillside will allow.

Tell us the street and what you want to add, and we will start with the slope and your zone.