A custom home on the Hudson in Edgewater, NJ
This house looks out over the Hudson River to New York City, from a lot that drops toward the water and sits below the street. Its owners plan to grow old in it. The story here comes from our own site videos of September 2025 and April 2026, so it shows the job as it stood then, not a finished house.
The street is higher than the house.
The carport was first drawn level with the first floor. The trouble was the street, which runs about 30 inches above that floor. In heavy rain, water coming off the road would have run downhill into the carport and on into the first floor.
So the carport changed. An engineering and architectural redesign raised it a little over two feet, which puts its finished surface well above the first floor, with stairs up to it. That redesign took about eight weeks.
The new plan gave the water somewhere to go: a drain at the foot of the stairs, another in the corner, and a linear drain in the trench across the front. The same trench carries the gas and electric lines for the emergency generator.
A broken drain line, found by camera.
The main drain leaves the house and runs by gravity down to the next street. We ran a camera through it to check it and found it broken in two places, both past the property line.
Reaching it meant taking down two trees. The plan from there was a mini excavator to pull the stumps, about 60 feet of new drain line back to the house, and then on with the framing.
Nothing about that shows on a set of drawings. It is the kind of thing that is far better found with a camera while the site is open than as a backup after the owners have moved in.
A house planned for growing old in.
The owners plan to stay, and that settled a lot of decisions early. By April 2026 the plumbing and electrical rough-in had started, and the mechanicals were already going in.
An elevator shaft from the start
The shaft is framed into the plan, from the primary suite down to a hallway on the lower level.
Heating and cooling
Mini-split systems do the heating and cooling. Radiant heated floors run on water from a combination boiler, and the loops were already in place when we filmed.
Quiet plumbing
Cast iron on the vertical drain lines to keep the noise down, tying back into PVC, and mineral-wool insulation planned between the first floor and the primary suite for sound.
Clean air
An air purification system, installed with the rest of the mechanicals on the lower level.
The envelope, as specified.
Siding, windows and roofs are our own trades, so the outside of a new house gets the same detail as the outside of an old one. How a build runs from the lot to the certificate of occupancy is on new home construction.
James Hardie board-and-batten in Evening Blue, with black trim to match the windows.
Andersen windows and sliding doors, and a Therma-Tru entry door in matte black.
Brown PVC soffits, with lighting planned all around the exterior.
An EPDM roof over the finished lower level, with Trex decking planned on top of it.
Three floors, stepping down toward the river.
The primary suite has a sitting area, a walk-in closet, a fireplace, a private deck with the river view, and a bathroom with a double vanity and a large walk-in shower.
The first floor is built around the views: a living room with a fireplace, a large custom kitchen island, a powder room, and a door out to the raised carport. If a kitchen is the part you are planning, see kitchens.
The lower level has an office, a bedroom, a walk-in closet and a full bathroom with a double vanity and a tub. It could work as a second primary suite.
Outside, the side yard is planned to step down in stages to the backyard, the way the neighboring yard does. There are a great many decisions on a house like this, and part of our job is raising them at the right time, so nobody moves in wishing they had done something differently.
What this job says about building on a hard lot.
Most of it applies well beyond Edgewater, and to an addition as much as a new house.
Check the street against the floor
Compare the street grade with the first floor before the drawings are final. Inches of difference decide where the water goes.
Camera the drain line first
What is under the ground is much easier to fix before there is a house on top of it.
Decide how you will live there
A shaft for a future elevator goes in at framing. It is a very different job once the house is finished.
Settle the quiet things at rough-in
Cast iron, sound insulation and radiant loops all go in before the walls close.
Zoning comes first on any lot. Our zoning and permits guide walks through it, and our guide to building on a sloped lot covers height, retaining walls and drainage on a hillside.
Have a lot or a set of plans?
Tell us where it is and what you have in mind, and we will tell you what the first steps look like.