JOHANNEMANN & SONSROOFING · EXTERIORS · CONSTRUCTION
(201) 446-5941 Free Estimate
Home additions · Upper Saddle River, NJ 07458

Home additions in Upper Saddle River, NJ

An addition in Upper Saddle River goes through more offices than most people expect. There is no separate zoning board, engineering review is required, and the borough’s filing sheet asks for soil, health and tree paperwork along with the plans. Most lots here are an acre, so room is rarely the problem. Getting the file right is.

What goes in

The filing package for an addition.

The borough’s filing sheet for an addition or a new home, revised in April 2025, goes to the Planning Board office at Borough Hall, and the forms, plans and fees go in together.

Soil Moving Permit application

Filed with the addition as a matter of course, not only when a lot of earth is moving.

Board of Health plan form

The Board of Health sees the plan as well, which ties in with the next item.

A plot plan showing septic and well

Signed and sealed, with both clearly noted. Where the septic system and the well sit can decide where an addition is able to go.

Tree Removal Permit application

Part of the same package, and worth preparing before the footprint is final.

Sealed architectural plans

Signed and sealed by the architect or engineer, in the number of copies the sheet asks for.

The survey and the permit forms

Signed and sealed copies of the survey used for the plan, and a construction jacket with the completed permit forms.

One board

No zoning board. The Planning Board does both jobs.

Upper Saddle River has no separate Zoning Board of Adjustment. The Planning Board acts as both, so if your addition needs a variance, that is where it goes. Engineering review is required for additions, and the borough lists zoning, engineering, soil movement, historic and health among the approvals that may have to come first.

The height, setback and coverage limits sit in the borough’s zoning ordinance and vary by zone, so we read them for your lot at the start. How a variance works, and the deadlines the law sets, is in our zoning and permits guide.

The houses

Big post-war houses on one-acre lots.

The borough stayed mostly rural until the 1950s, then its population grew tenfold between 1950 and 1970, on one-acre lots. So a typical house here is a center-hall colonial, split-level or ranch of that age, with later custom houses on the same lots and a few Dutch stone and frame houses along the river roads.

An addition on a house like that is a matter of proportion: a long roof, a wide footprint, and a new wing that has to read as part of them. A second story on a long ranch usually needs more than a box on top, and a new wing on a colonial has to respect the symmetry of the front. Roofing and siding are our own trades, so the tie-in is drawn by the people who will build it.

Sometimes the better answer on a lot this size is a new house. New home construction covers that route, and our second-story guide helps you compare.

The site

Trees at the edge, and houses on the inventory.

Trees in the buffers

The borough’s rule turns on where the tree stands: eight inches or more, dead or alive, in the 10-foot right-of-way, the 10-foot side buffer or the 15-foot rear buffer. Trees have to be tagged and photographed for the application.

Historic homes

A Historic Preservation Commission looks after houses on the Borough Inventory of Historic Sites, almost all built before 1900. If your house is on it, ask before design starts.

Inspections on the ground

Silt fence and seepage pit inspections are scheduled with the Borough Engineer, so the site work is checked as well as the house.

Keep reading

The rest of the job in Upper Saddle River.

Questions
Do you build additions in Upper Saddle River?

Yes, anywhere in 07458. We prepare the filing package with you and work with your architect or help you find one. Licensed plumbers, electricians and heating contractors are scheduled by us, and the roof and siding are our own trades.

Who hears a variance in Upper Saddle River?

The Planning Board. It acts as both the planning board and the zoning board, so there is no separate zoning board of adjustment.

Why does the plot plan have to show my septic system and well?

The borough’s filing sheet asks for both to be clearly noted, and the Board of Health sees the plan. Where they sit can limit where an addition can go, so it is worth knowing before the design is drawn.

Do I need a tree permit to build an addition here?

The filing package includes a Tree Removal Permit application. The borough’s rule covers trees of eight inches or more, dead or alive, in the right-of-way and the side and rear buffers. Ask about any tree near the work.

Where these rules come from

The Borough of Upper Saddle River’s filing requirements for an addition or new home (April 2025); its Planning Board, prior approvals, engineering, tree and historic preservation pages.

We read these in November 2026. Towns change their rules, and your zone, your lot size, a corner lot and the way the house sits today all change what applies. Confirm any figure with the Borough zoning officer before you rely on it. This is general information, not legal advice.

Start with the survey

Tell us about the house and the acre around it.

Where the septic and well are, if you know, and what you want the room for. We will start from there.

Or call — an active leak should not wait on email.
Call (201) 446-5941 Free estimate