Home additions in Ho-Ho-Kus, NJ

Ho-Ho-Kus runs from one-acre lots down to lots of 6,500 square feet, so two houses a few streets apart can face very different limits. Most are colonials, Cape Cods and Tudors, on tree-shaded lots under steep roofs. An addition here starts with which zone you are in, then the roof, then the trees.

The zones

Four zones, and a big range between them.

These are the single-family lot sizes in the borough’s 2019 Master Plan. Setbacks and coverage are set zone by zone in the zoning ordinance, so we read them for your lot at the start rather than quote them here.

ZoneLot sizeFrontage
R-1One acre200 ft
R-210,000 sq ft75 ft
R-2A7,500 sq ft60 ft
R-36,500 sq ft60 ft
Going up

Three rules that shape a taller house here.

Height is measured to the middle of the roof

Under the definition the borough adopted in July 2026, height on a gable, hip or gambrel roof runs from the average finished grade, taken six feet out from the house at 10-foot intervals, to the mean height between the eaves and the ridge. A steep roof is not measured to its peak, but the finished grade around the house does count.

Second stories have their own setback

The R-2 zone carries a separate second-story setback, listed apart from the front yard on a 2025 Zoning Board agenda. So a second story is not judged on the same line as the first floor below it, and it is worth checking before the plan is drawn.

The roof is what gives it away

A steep gable or a Dutch Colonial’s gambrel has to carry on into the new work without a visible seam. Roofing is our own trade, so we settle the pitch, the overhang and the valley on paper. See what a second story involves.

The paperwork

It starts with a zoning permit, not a hearing.

The first step is a residential zoning application with a survey. Every application is subject to engineering review. If the Zoning Officer finds the plan does not comply, a variance application starts from that denial letter and goes to the Zoning Board of Adjustment, which is a separate body from the Planning Board.

That sequence is worth respecting. A short conversation about your lot, before the drawings are finished, is much cheaper than a redesign after a denial. Our zoning and permits guide covers how variances work in New Jersey and the deadlines the law sets.

The site

Trees and water come with the job here.

On a shaded lot near a brook, these can decide where the addition goes.

A permit before a tree comes down

The borough asks for a permit before private trees are removed, and its replacement table starts at a six-inch trunk. Construction is one of the things that triggers replacement.

Barriers around the trees that stay

Tree barriers go at least 10 feet from the trunk or at the drip line, whichever is greater. On a tight side yard, that can set where equipment can reach.

Drainage from 200 square feet

The borough’s drainage chapter applies to any increase of more than 200 square feet of regulated hard surface on a single-family lot, and the Borough Engineer reviews it.

Low ground

The Master Plan puts parts of Bogert Road and Hollywood Avenue in flood hazard areas. If your lot is mapped, an addition brings extra steps, so ask early.

Keep reading

The rest of the job in Ho-Ho-Kus.

Questions
Do you build additions in Ho-Ho-Kus?

Yes, anywhere in 07423, in all four zones. The first step is the zoning application and survey, which we prepare with you. We work with your architect or help you find one, and the roof and siding are our own trades.

Who hears a variance in Ho-Ho-Kus?

The Zoning Board of Adjustment, which is separate from the Planning Board. The application follows a denial from the Zoning Officer, so the zoning application and survey come first.

How does Ho-Ho-Kus measure building height?

From the average finished grade, taken six feet out from the house at 10-foot intervals. On gable, hip and gambrel roofs it runs to the mean height between the eaves and the ridge, under the definition adopted in July 2026.

Do I need a tree permit for an addition in Ho-Ho-Kus?

If trees are coming down, yes. The borough asks for a permit before private trees are removed, its replacement table starts at a six-inch trunk, and construction is one of the things that triggers replacement. Pruning a tree that stands entirely on your own property needs no permit.

Where these rules come from

The Borough of Ho-Ho-Kus’s 2019 Master Plan; Ordinance 2026-121 on height; Ordinance 2025-105 on drainage; its residential zoning application; and its tree rules.

We read these in November 2026. Towns change their rules, and your zone, your lot size, a corner lot and the way the house sits today all change what applies. Confirm any figure with the Borough Zoning Officer before you rely on it. This is general information, not legal advice.

Start with the survey

Which zone are you in, and what do you need?

Tell us the street and the room you are after, and we will start with what your lot allows.

Or call — an active leak should not wait on email.
Call (201) 446-5941 Free estimate