JOHANNEMANN & SONSROOFING · EXTERIORS · CONSTRUCTION
(201) 446-5941 Free Estimate
Home additions · Allendale, NJ 07401

Home additions in Allendale, NJ

In Allendale, a second story can need a variance even when the footprint does not move. The side yard here is worked out from the size of the house as well as the lot, so adding floor area can change what the borough requires along a wall that stays exactly where it is.

The rule to know

Why a house can stop complying without moving.

Every residence zone in Allendale now points to an enhanced side yard rule, and the Land Use Board’s minutes show how it works: the required side yard is based on the gross building area of the house. Add floor area and the number goes up.

An April 2025 case makes the point. A house in the AA zone on a lot of about 33,400 square feet was fully conforming. Its owners proposed a second story on the same footprint. Because the floor area went up, so did the side yard the house needed, and the addition required a variance for walls that were not moving.

Floor area matters in its own right too. Every variance application has to include a floor area ratio calculation, and the Borough’s application treats going over the ratio as a “D-4” variance, which is a harder case to make than a setback. So we run both numbers from the survey before anyone draws.

The lots

Near the station, and further out.

Allendale grew outward from the railroad. The main residence zones run from 20,000 square feet in the A zone to 26,000 in AA and 40,000 in AAA.

The older streets

The grid laid out from 1868 around Park Avenue, Mallinson Street, First Street and Brookside Avenue.

  • Older houses on their original building plots, where going back or going up is usually the question.
  • Roof lines and trim from another era, which the new work has to carry on.

See what a second story involves.

Further out

Mid-century and later houses on larger lots toward Saddle River, Wyckoff and Mahwah.

  • More room to spread, so the question becomes how a new wing joins the roof already there.
  • A bigger lot does not switch off the side yard rule, because the house counts as well as the land.

See the six options on home additions.

The sequence

How an addition runs in Allendale.

One board handles the zoning side here, and the rest follows the state code.

01

Survey, zone and floor area

A current survey, the limits for your zone, and the floor area and side yard worked out for the house you want rather than the house you have.

02

The Land Use Board, if needed

Allendale has one combined board acting as both planning board and zoning board. If the design needs relief, this is where it goes. Our zoning and permits guide covers how variances work.

03

Drawings and engineering

Sealed construction drawings, with a structural engineer for any second story, beam or new foundation.

04

Permits, then the build

Construction permits across the subcodes, inspections as the work goes up, and a certificate of occupancy before the new room is used.

The site

Trees, soil and runoff.

The borough lets an owner remove up to six live trees in 12 months, counting anything six inches across at four feet above the ground, with a permit through the construction office. A project that clears more than that is a question to ask early, and the variance application refers to a tree inventory form where it applies.

The same application refers to a soil movement application where soil is coming on or off the lot. And in one 2026 approval, the board made seepage pits a condition so the project added no net runoff. We could not find a square-foot trigger for that, so we ask at the start rather than assume.

Keep reading

The rest of the job in Allendale.

Questions
Do you build additions in Allendale?

Yes, anywhere in 07401, on the older streets near the station and on the larger lots further out. We work out the side yard and floor area first, then file the permits. Plumbing, electrical and heating go to licensed contractors we schedule.

Who hears a variance in Allendale?

The Land Use Board. It is one combined board that acts as both the planning board and the zoning board, so there is no separate zoning board of adjustment.

Can a second story need a variance if the footprint stays the same?

Yes. The required side yard is based on the gross building area, so adding floor area can raise it. In an April 2025 case, a conforming house in the AA zone needed a variance for a second story on the same footprint.

What are the lot sizes in Allendale’s residence zones?

The April 2025 Land Use Plan gives 40,000 square feet in AAA, 26,000 in AA and 20,000 in A. Your setbacks, floor area and coverage depend on your zone and your lot, so check them with the zoning officer.

Where these rules come from

The Borough of Allendale’s Land Use Board page; Land Use Board minutes of April 23, 2025 and April 22, 2026; its variance application; its 2025 Land Use Plan; and its tree removal page.

We read these in November 2026. Towns change their rules, and your zone, your lot size, a corner lot and the way the house sits today all change what applies. Confirm any figure with the Borough zoning officer before you rely on it. This is general information, not legal advice.

Start with the survey

Find out what your house can add.

Tell us the street and the room you need, and we will work out the side yard and floor area first.

Or call — an active leak should not wait on email.
Call (201) 446-5941 Free estimate